1、電蒸汽鍋爐http://www.hbyuandong.com.cn/與軟水器連接的管道應采用給水塑料管,排水管不得采用軟塑料管,防止管道變形,影響排水效果。
Electric steam boiler pipes connected with a water softener should be used plastic water pipes, drains should not be used flexible plastic tubing, to prevent pipeline deformation, affecting drainage effect.
2、按照電蒸汽鍋爐控制閥進(jìn)出水箭頭標記連接進(jìn)出水管,采用流量型再生控制器,流量計必須安裝在出水口。
An electric steam boiler control valve out of the water inlet and outlet pipe connected to the arrow mark, the use of flow-type regeneration controller, flowmeters must be installed in the outlet.
3、電蒸汽鍋爐進(jìn)出水管應裝有壓力表及手動(dòng)閥門(mén),同時(shí)還應裝有旁通閥,在出水管閥前還應安裝有取樣閥。進(jìn)水管閥后一般安裝有Y型過(guò)濾器,防止管道內污物堵塞閥體造成設備無(wú)法正常運行。
Electric steam boilers out of the pipe should be fitted with pressure gauges and manual valves, but also be equipped with a bypass valve in the outlet pipe valve should be installed before sampling valve. After the inlet valve is usually equipped with a Y-type filter to prevent dirt clogging the pipeline valve cause the device to not function properly.
4、電蒸汽鍋爐排水管的連接長(cháng)度不應超過(guò)6m,盡量減少彎度,并嚴禁安裝閥門(mén)。
Electric steam boiler drain connection length should not exceed 6m, to minimize camber, and are prohibited from installing the valve.
5、電蒸汽鍋爐http://www.hbyuandong.com.cn/鹽水管路連接長(cháng)度不應超過(guò)2m,一定要保持良好的密封性,否則會(huì )影響軟水器的再生效果。
Electric steam boilers brine pipeline connection length should not exceed 2m, we must maintain a good seal, otherwise it will affect the regeneration softener.